What is preventive maintenance? Types, examples and how to start

Preventive maintenance is planned, scheduled work done on equipment before it fails — lubrication, inspections, part replacements — triggered by time, usage or condition, to cut unplanned downtime.

Key takeaways

  • Preventive maintenance (PM) is scheduled work done before failure, not after.
  • PMs are triggered by calendar time, runtime/usage or a meter threshold.
  • Start with your most critical assets and the manufacturer's recommended intervals, then tune from failure history.
  • Track PM compliance — the share of PMs completed on time — as your first KPI.

Preventive vs reactive maintenance

Reactive (run-to-failure) maintenance waits for something to break. It looks cheap until you count the lost production, rushed parts orders and overtime. Preventive maintenance flips this: small, planned jobs at known intervals so that most failures never happen.

Types of preventive maintenance

  • Time-based — every week, month or quarter (e.g. monthly gearbox oil check).
  • Usage-based — every N running hours, cycles or kilometres (e.g. compressor service every 2,000 hours).
  • Condition-based — when a reading crosses a limit (e.g. bearing temperature above 80 °C).
  • Predictive — when analysis of vibration, oil or thermal data forecasts a failure.

Examples on a plant floor

  • Daily: check hydraulic oil level and leaks on presses.
  • Weekly: grease conveyor bearings, inspect belts for wear.
  • Monthly: clean motor cooling fins, tighten electrical terminals.
  • Yearly: overhaul gearboxes, calibrate instruments.

How to build a PM program

  1. List your assets and rank them by criticality — what stops production if it fails?
  2. Pull the OEM manuals for recommended tasks and intervals.
  3. Write each PM as a checklist with clear, checkable steps.
  4. Schedule it so the work order is created automatically.
  5. Review monthly: completion rate, findings, and failures that PMs missed. Adjust intervals.

Common mistakes

Too many PMs too soon (technicians fall behind and compliance collapses), vague tasks like "check machine", and never revisiting intervals once failure data comes in.

How Opmaint helps

Opmaint schedules PMs by date, runtime or meter reading, creates the work order with its checklist automatically, and shows PM compliance per asset and per technician. See preventive maintenance in Opmaint.

Frequently asked questions

What is the difference between preventive and predictive maintenance?

Preventive maintenance runs on a fixed schedule or usage interval. Predictive maintenance uses condition data — vibration, temperature, oil analysis — to forecast when a failure is likely and schedules work only then.

What is a good PM compliance rate?

Many maintenance teams target 90% or more of PMs completed within their scheduled window.

How often should preventive maintenance be done?

Start with the manufacturer's recommended intervals, then adjust based on your own failure history and operating conditions.

Your plant could be next

Ready to write your own success story?

  • Work orders your technicians close from their phone
  • Preventive maintenance that schedules itself
  • Every asset's history in one place