Key takeaways
- Isolate all energy: electrical, hydraulic, pneumatic, mechanical, thermal, gravity.
- Each worker applies their own lock; only they remove it.
- Always verify zero energy before starting work.
- Build LOTO steps into the work order checklist so they are never skipped.
The standard LOTO steps
- Prepare — identify every energy source from the machine's LOTO procedure.
- Notify affected operators.
- Shut down the equipment normally.
- Isolate each energy source.
- Lock and tag each isolation point with a personal lock and tag.
- Release stored energy — bleed pressure, block raised parts, discharge capacitors.
- Verify — try to start the machine and test for zero energy.
- Do the work, then remove locks in reverse order after checks.
Common failures
Missing a secondary energy source, sharing locks, skipping verification, and procedures that live only in a binder in the office.
How Opmaint helps
Attach the machine's LOTO procedure to the asset and put the isolation and verification steps at the top of every work order checklist, with a sign-off before work can proceed.
Frequently asked questions
Who can remove a lockout lock?
Only the person who applied it, except under a controlled, documented removal procedure when that person is unavailable.