Key takeaways
- Every maintenance job — planned or breakdown — should be a work order tied to an asset.
- A good work order has: asset, problem, priority, assignee, due date, checklist, parts and closing notes.
- Track backlog and time-to-close to see whether the team is keeping up.
- Closing notes and photos are what turn work orders into useful asset history.
The work order lifecycle
- Request — an operator or technician reports a problem (ideally by scanning the asset's QR code).
- Triage — the supervisor sets priority and type: breakdown, corrective, preventive, inspection.
- Assign and schedule — to a technician or team, with a due date.
- Execute — follow the checklist, record readings, consume parts.
- Close — root cause, work done, time spent, photos, sign-off.
- Review — the closed job becomes part of the asset's history.
What to put on a work order
- Asset and location
- Clear problem description
- Priority (e.g. P1 safety/production stop → P4 cosmetic)
- Assignee and due date
- Checklist or procedure
- Parts required and used
- Labour time, failure cause and resolution notes
Setting priorities
Keep it to three or four levels and define each one in terms of impact, not urgency felt. A typical scheme: P1 safety risk or line stopped; P2 production degraded; P3 planned within the week; P4 when convenient.
Metrics to watch
- Backlog — open jobs, in hours of work, not just a count.
- Mean time to close by priority.
- Planned vs unplanned ratio — a healthy plant does most work planned.
How Opmaint helps
In Opmaint, anyone can raise a request from the mobile app or by scanning an asset QR code. Supervisors assign it, technicians close it with photos, checklist and parts, and the history lands on the asset automatically. See work order management.
Frequently asked questions
What is a work order in maintenance?
A document — paper or digital — that authorises and records a single maintenance task: the asset, the problem, who is assigned, the parts and time used, and how it was resolved.
What is the difference between a work request and a work order?
A work request is a report that something needs attention. A supervisor reviews it and converts it to a work order once it is approved, prioritised and assigned.