Key takeaways
- Pick one site or area and a clear goal (e.g. all breakdowns logged, PM compliance tracked).
- Clean the asset list before importing it.
- Train technicians on the mobile app first, managers second.
- Retire the old register on a fixed date so nobody runs two systems.
1. Set the goal
Choose one or two measurable outcomes for the first 90 days: every breakdown logged as a work order, PMs on critical assets scheduled, MTTR visible.
2. Prepare the data
Asset list with IDs and locations, PM schedules from manuals or registers, spare parts with current stock. Fix duplicates and naming before import.
3. Configure
Users and roles, work order priorities, PM schedules and checklists, QR tags on assets.
4. Train on the floor
Short sessions at the machine: raise a request, close a job, complete a checklist. Managers then learn assignment and reports.
5. Go live and cut over
Pick a date after which the old register stops. Running two systems in parallel is where most rollouts stall.
6. Review and expand
After 30 days, review adoption and data quality, then add parts, meters and more areas.
How Opmaint helps
Opmaint's onboarding team imports your assets, PM schedules and parts, and trains admins and technicians — most plants are running within a couple of weeks. Talk to us about your rollout.
Frequently asked questions
Why do CMMS implementations fail?
Usually because technicians find it slower than the old way, the imported data is messy, or the team keeps the old system running in parallel.