Key takeaways
- Criticality = consequence of failure, often multiplied by likelihood.
- Score safety, production, quality and repair cost on a simple 1–5 scale.
- Use the ranking to decide PM depth, spares holding and strategy per asset.
- Revisit scores when lines, products or redundancy change.
Why rank assets
Maintenance time is limited. Without a ranking, the loudest breakdown gets attention, not the most important one. A criticality score makes the trade-off explicit.
A simple scoring method
- Score each asset 1–5 on safety/environment, production impact, quality impact and repair cost/lead time.
- Take the highest score (or a weighted sum) as the consequence.
- Multiply by a 1–5 likelihood of failure from history.
- Group into A (critical), B (important), C (run-to-failure acceptable).
Using the result
- A assets: full PM, condition monitoring, critical spares on site.
- B assets: standard PM schedule.
- C assets: reactive, minimal spares.
How Opmaint helps
Set a criticality on every asset in Opmaint and filter work orders, PMs and reports by it, so critical equipment is never buried in the backlog.
Frequently asked questions
What is a critical asset?
An asset whose failure would cause a safety incident, stop or seriously degrade production, or be very expensive or slow to repair.