Verification of Pile Load Test Reports against design parameters and Indian Standard (IS) codes (e.g., IS 2911 series) compliance?
["Compliant", "Non-Compliant"]
Assess the competency of site supervision and engineering personnel in managing soil stability risks and implementing control measures.
Record the maximum daily excavation depth achieved and observed ground movement (if any) as per site supervisor's Chalan and logs.
Identify any observed defects or non-conformities in excavation slope stability or shoring/strutting systems.
["Evidence of localized collapse/sloughing", "Excessive deformation of shoring members", "Inadequate bracing/support", "Water ingress at critical points", "Lack of regular inspection records (e.g., daily checklists)"]
Effectiveness of the dewatering system in maintaining the desired groundwater table below excavation level?
Availability and adherence to Geotechnical Investigation Report (SIR) recommendations and drawings?